Concrete Placement

Keystone Concrete Placement is a full service turnkey commercial concrete construction company with considerable knowledge and experience in the construction of commercial, industrial, institutional facilities, as well as, multi-family, custom home, and tract residential markets.

Keystone's specialties include:
- Slabs on grade
- Tilt wall panels
- Elevated slab on metal decks
- Elevated formed decks
- Post-tensioned slabs
- Concrete paving
- Precast concrete

Keystone Concrete Placement has a proven track record of quality and cost effective projects. We owe this record to our commitment to the team concept of project management. We work closely with builders, contractors, architects, engineers, and owners, because we feel that communication is the key element in the success of a construction project. The free flow of detailed information between all parties is essential to that goal.

Let Keystone Concrete Placement put our knowledge, experience and commitment to work for you. For more information about Keystone and our commercial concrete services, please submit a contact form or visit our contact us page for information about our regional offices.

Projects

Sulzer USA

Mat Foundation and Walls

TAM Global Manufacturing

TAM Global Manufacturing

Black Forest Jet Center

Black Forest Jet Center - Contract Value: $3,350,000.00  

SAC Planetarium

22,000-square-foot Scobee Planetarium and Challenger Learning Center complex began in May of 2012 and is slated to be complete in fall 2013.

Neopal

110,000 square foot production warehouse. 200,000 square feet of paving. 50,000 square feet of tilt-wall panels.

Randolph Brooks Administration Center

Four-story tilt wall building, total floor area of building is 148,500 sqft

MSI Project

The MSI project consist of 100,00 sqft. of paving, 130,116 sqft. of slab on grade, and 11,000 sqft. of slab on metal deck. There is over 53,000 sqft of panels!

UHS Heliport

UHS Heliport

Lacks Distribution

This project was a 300,000 sf tiltwall project the entire project required separate casting slabs from the permanent slab on grade. The project contained over 115,000 sf of 10” thick tiltwall panels, along with over 78,000 sf of slab on metal deck. The site concrete paving contained over 200,000 sf of 7” thick . The project also contained a separate maintenance building.

Lieck Elementary

This is a project that has over 105,000 sf of crawlspace cast in place elevated pan slab on the project, it also included over 4,000 l.f. of isolated elevated beams This particular school was designed to incorporate the elevation change in the design of the structure that created multiple elevation changes in the structure along with scheduling and construction sequences not used on typical projects.