Structural Concrete

Keystone Structural Concrete's division was formed in 2000. Scott Anderson (VP) and Bryan Larson (Field Operation Manager) have successfully constructed over 250 million dollars in contracts over the last ten years. Keystone Structural Concrete has performed work throughout Texas and Louisiana and their projects range from the Dell Children’s Medical Center to the upscale living Gables at Tennis Center.

Client goals and expectations are never compromised when you hire Keystone Structural Concrete. We offer years of practical field experience and engineering background to make your vision a reality. From our closely monitored concrete mix designs to our first class equipment and forming systems, no detail goes unnoticed.


Scott Anderson named President of ASCC

Scott Anderson, Vice President & General Manager of Keystone Structural Concrete has been elected President of The American Society of Concrete Contractors (ASCC) for a 2 year term

Anadarko Hackett Tower - Houston Business Journal 2015 Landmark Award

Anadarko Hackett Tower - A job completed by Keystone Structural Concrete and KeyScape Landscaping

Mat Foundation on a high-rise in The Woodlands, Texas

Keystone Concrete safely pumped and placed over 7400 cubic yards of concrete in less than 10 hours.

Perkins Rowe

New retail and office complex with a lapped flange form pan system.

Ocean Grove

This project was located in Galveston, TX and consisted of 27,095 sf of slab on grade and 119,815 sf of elevated concrete.

McComb's Plaza

This project was a six story 143,000 sf office building.


Cosmopolitan was a 24 story flat slab turn-key structure.

TAMU Agricultural Headquarters and Visitor Center

This project was a 6 story pan slab turn-key concrete structure. The construction of this educational facility consisted of two buildings containing approximately 12,290 cubic yards of concrete.

Granite Westchase II

Granite Westchase II consisted of one 15 story 350,000 square foot office tower, an 8 story 345,000 square foot precast garage and 54,000 square feet of site concrete.

APM Maintenance and Storage Facility

This project consisted of 19,770 square feet of elevated slab and 5,400 square feet of slab on metal deck.