Concrete Placement
Lieck ElementaryThis is a project that has over 105,000 sf of crawlspace cast in place elevated pan slab on the project, it also included over 4,000 l.f. of isolated elevated beams This particular school was designed to incorporate the elevation change in the design of the structure that created multiple elevation changes in the structure along with scheduling and construction sequences not used on typical projects. |
Lacks DistributionThis project was a 300,000 sf tiltwall project the entire project required separate casting slabs from the permanent slab on grade. The project contained over 115,000 sf of 10†thick tiltwall panels, along with over 78,000 sf of slab on metal deck. The site concrete paving contained over 200,000 sf of 7†thick . The project also contained a separate maintenance building. |
Structural Concrete
Landscape
Houston ZooKey-scape will complete over 1.3 million dollars worth of landscaping at the Houston Zoo. The project management team had to work with plant growers out of Florida and California to recreate this African Jungle environment. Key-scape uses the same proven business model that has made Keystone Concrete so successful. This project will be complete in November 2010. |