About This Project

Owner: Black and Black Realty of Texas

Customer:  Spaw Maxwell

The system shown above is a Storm Tech underground detention system that was installed on this particular job for the client.  The capacity for this system was 54,985 cubic feet detention volume provided in the storm tech system.  This storm water pollution prevention plan was used in this project as a new application to construction. 

Project Timeline

Project Timeline

Project Photos