Lacks Distribution

Lacks Distribution

About This Project

  • GC – CF Jordan
  • Architect – RVK Architects
  • Structural Engineer –  Henry K. Ng and Associates
This project was a 300,000 sf tiltwall project  the entire project required separate casting slabs from the permanent slab on grade. 
 
The project contained over 115,000 sf of 10” thick tiltwall panels, along with over 78,000 sf of slab on metal deck. The site concrete paving contained over 200,000 sf of 7” thick .  The project also contained a separate maintenance building.

Project Timeline

There is no timeline available for this project.

Division:

Project Photos