Lieck Elementary

Lieck Elementary

About This Project

  • GC: Bartlett Cocke
  • Architect: Noonan Rittiman
  • Structural Engineer: Persyn Engineering

 

This is a project that has over 105,000 sf of crawlspace cast in place elevated pan slab on the project, it also included over 4,000 l.f. of isolated elevated beams This particular school was designed to incorporate the elevation change in the design of the structure that created multiple elevation changes in the structure along with scheduling and construction sequences not used on typical projects. With the coordination of Bartlett Cocke we were able to expedite the schedule by several weeks to help get the steel erector started quicker than anticipated.

Project Timeline

Project Timeline